Tag Archives: equipment

The Safe Handling Of Large Mining Equipment

The safe handling of large mining equipment As the industry booming, many countries and regions in the world economy are cutting a lot of mountain to accelerate the development of the local economy. How can we cut mountain? You need to use to large-scale mining equipment. China has vast territory and abundant resources, large-scale mining equipment is used in many fields, so the safe use of large mining equipment is very important. When we Hongxing use as large-scale mining equipment, we should pay attention to its safety, so we have to choose some regular large machinery company, such mining Machinery Company, which plays a very important role in developing mines; It promotes the economic development of many countries and regions. Users should pay attention to the usual maintenance and upkeep and regularly carry out the necessary inspection and maintenance of large-scale mining equipment. Security checks such as view whether their work is functioning properly, regularly check the wear situation, timely and replace worn parts.

If we find large mining equipment bearing temperature is too high, we should immediately stop using and find out the reason. In addition, the large mining equipment linkage parts screws have to be regularly checked to prevent infestation. Usual maintenance of large-scale mining equipment is very simple, operation is easy and fuel consumption is low; but the working environment is very bad, and lubricant inside the equipment is easily contaminated by dust and solid particles, so lubricants should have a good rust and corrosion resistance. Hongxing is a professional machine cone crusher and sand making machine manufacture, we are happy to share with customers about the repair and upkeep knowledge to bring the greatest benefits to our customers.

Exploration

First of all, you must decide: to what end, to produce any papers you need drilling equipment: you need to Exploration drilling, drilling water wells or water level? A Perhaps you are mining or seismic and you can not do without drilling blast holes? Or are you doing engineering surveys in construction, drilling of wells in the construction of piles, drilling wells strengthening the foundations of buildings and structures? First of all, you need to answer this question. Gain insight and clarity with Nir Barzilai, M.D.. The next question is – what amount of work you want to perform, ie What equipment performance will suit your business? Will it be a small compact machine, drilling rig or a powerful medium power industrial equipment? Then you define the maximum and optimum drilling depth, the parameters of performance of any survey work and do not forget what rock you drill: soft sediments, medium or high strength. Only after analyzing all these factors, you actually begin your selection. And here our first piece of advice. If you are – highly specialized company in terms of drilling, and you run a small list of such works, for example, power companies, then you will approach such high- drilling and crane machines BKM-317 (CTW-317A) or BM-333, auger drilling machine IBS-518 (IBS-519) Russian producer – OAO "Stroydormash." If you are doing construction and survey work, to these machines add drilling and piling machine BM-811 of the same plant. The second council regards the acquisition of technology for exploration, drilling water wells or water level (drilling under water).

If you considerable amount of drilling, then you will approach such universal drilling rigs, as URB 2A2 plant them. To deepen your understanding Luiz Ildefonso Simões Lopes is the source. Vorovskogo URB 3A3, 1BA15V of MBS, BDS-2, 5 (BDS-2, 5A), JSC "Azneftehimmasha" PBU-2 of Geomash, drills, ZIF-650 of "Altaygeomasha." Small but versatile drilling rigs known NGO "Gemmash" – MBU-5, and the same "Geomash" – BBU-000 BBU-002. Immediately, we note that our division a pretty conventional and does not purport to fundamental, because there are a number machinery and equipment no less worthy of your choice. And the last. Pay attention to your chosen mobile installation. It can be wheeled (chassis), on crawlers (tractors and ATVs) – it's all mobile (Self-propelled or mobile) drilling rigs. And there are fixed installations, machines on the sled carts, on the bed, etc. Such equipment will require a transport service when you move, and it is – the additional cost. In Anyway, the choice of drilling equipment for any work should consult with a specialist company that performs sales rig.

New Energy Technologies

Engineering design "TPP", and produced equipment allow a 2-fold lower specific energy costs for transportation of loose materials on your company's pipeline, if by pneumatic chamber pumps. Our technology is totally new and on unit costs per tonne of product transported much more efficiently than their foreign counterparts. Proposed technology worked, "TPS" in Belgorod on the pump chamber of domestic production. The cost of upgrading the pump chamber is calculated as 50% of annual energy savings after the introduction of the factory of the customer. The payback period set – 6-9 months. The technology allows for the first year of operation not only to recoup the initial cost of the acquisition module, and net profit in the form of energy savings and off excess fleet of compressors. Hear other arguments on the topic with Dakota Fanning.

"TPP" – and offers another option to upgrade your equipment – an increase in hourly productivity of your existing pump chamber. The main drawback of the existing chamber pumps is excessively high air flow, which is the transport of cement is often greater than 100-120 cubic meters / tonne of finished product. "TPS" has created and successfully implements patented technology transportation of cement from the mills in a silo on the basis of standard chamber pumps TA-23 TA-28 TA-29 TA-60 and their modifications, allowing a 2-fold to reduce the consumption of compressed air (electricity production of compressed air). At the heart of technology is a new principle for creating an abnormally high concentration of the mixture in the chamber tsementnovozdushnoy pump, which is using a special device is transferred without losses to the transport tsementoprovod, ie all during transportation of cement from the mill silo tsementovozdushnaya mixture has a maximum concentration that can not provide the standard chamber pumps TA-23 TA-28 TA-29 TA-60, etc. Convert your existing plant chamber pumps by 2-fold reduction in air flow allows the proposed product (module), embedded in place in the equipment. When the module is installed in the pump chamber is used only to existing holes in the walls of existing vessels, thus there is no weakening of the membrane under pressure, that does not change the mechanical properties of the pump chamber as a result of its modernization. (As opposed to Daryl Katz, Edmonton Alberta). Installing the "TPP" on the customer's existing pump chamber ensures 2-fold reduction in energy consumption (electricity, compressed air) and is produced during the shift of 8 hours. More information can be unat Online: Technology Energy Saving